When a business runs around the clock, the shift pattern decides how many people you need, how tired they are, and how much overtime you pay. Two of the most searched 12-hour patterns are the 2-2-3 schedule and the 4-on-4-off schedule. This guide explains how each one works, shows the calendar for both, compares them with DuPont, and covers the overtime and rest rules that catch managers out.

The quick answer

All three patterns below use four crews and 12-hour shifts to cover 24 hours a day, 7 days a week. On average each person works 3.5 shifts a week (42 hours), which is about 182 shifts and 2,184 hours a year. They differ in how the days off are spread.

Pattern Cycle Longest run of work Longest break Weekends off
2-2-3 (Pitman) 14 days 3 shifts 3 days Every other weekend is a long weekend
4-on-4-off 8 days 4 shifts 4 days Weekends rotate through the cycle
DuPont 28 days 4 shifts 7 days once per cycle One long break every 4 weeks

How the 2-2-3 schedule works

The 2-2-3 schedule, also called the Pitman schedule, is a fixed pattern: work 2 days, off 2 days, work 3 days, then off 2 days, work 2 days, off 3 days. It repeats every 14 days. Two crews cover the day shift and two cover the night shift, so a crew never rotates between days and nights.

Here is the 14-day calendar for the two day crews. Crew C and Crew D follow the same pattern on the night shift. "12h" means a working day and a dash means a day off.

Crew 1 2 3 4 5 6 7 8 9 10 11 12 13 14
A 12h 12h - - 12h 12h 12h - - 12h 12h - - -
B - - 12h 12h - - - 12h 12h - - 12h 12h 12h

Each crew works 7 shifts in 14 days, which is 84 hours, or an average of 42 hours a week.

Pros: no one is ever away from home for more than three working days in a row, every second weekend is a three-day break, and the pattern is easy to remember. Cons: the 12-hour shifts are long, and the pattern creates uneven weeks (see the overtime section below).

How the 4-on-4-off schedule works

With 4-on-4-off, each person works four shifts in a row and then has four days off, on an 8-day cycle. Two crews cover the days and two cover the nights, so the 24/7 cover needs four crews in total.

Crew 1 2 3 4 5 6 7 8
A (days) 12h 12h 12h 12h - - - -
B (days) - - - - 12h 12h 12h 12h

The night crews run the same pattern on the night shift. Some sites mix days and nights inside the four-day block, so confirm what your own sites do. The average is again 3.5 shifts, or 42 hours a week.

Pros: four days off in a row gives real recovery time and the pattern is the simplest to explain. Cons: four consecutive 12-hour shifts is tiring, and weekends are not protected because the cycle does not follow the calendar week.

How the DuPont schedule compares

The DuPont schedule runs over 28 days with four crews. A crew works 4 nights, has 3 days off, works 3 days, has 1 day off, works 3 nights, has 3 days off, works 4 days, and then gets 7 days off. It gives one full week of rest every four weeks, but it rotates people between nights and days, which is harder on sleep than a fixed pattern.

United States. The federal rule counts hours per fixed workweek, not per cycle. In a 2-2-3 pattern, a crew can work five 12-hour shifts (60 hours) in one week and two shifts (24 hours) in the next, even though the two-week average is 42. Depending on where your workweek starts, that can create overtime in the heavy week. Some healthcare employers can use the 8/80 method, which counts overtime over 14 days. State rules, such as daily overtime in California, add more cases. Always have your payroll rules set up before you adopt the pattern.

United Kingdom. The Working Time Regulations require 11 hours of rest between shifts, a 20-minute break for shifts over six hours, and a weekly rest of 24 hours (or 48 hours per fortnight). Night workers have a lower average limit on normal hours. A 12-hour shift followed by 12 hours of rest is allowed, but fixed 12-hour nights need careful risk assessment.

India, Canada and South Africa. Daily and weekly hour limits differ by law and sector. A 12-hour pattern usually needs a written agreement, a clear overtime rule for hours above the legal limit, and a defined weekly off. Check your state, province or sector rule before you roll it out.

The principle is the same everywhere: decide in advance which hours count as overtime and which crews are paid at a premium for nights, rest days and holidays.

Fatigue and safety

  • Avoid long runs of consecutive night shifts, and give at least 24 hours of rest after the last night shift.
  • Keep handovers short and written, because errors rise around shift change.
  • Do not let people swap into a second 12-hour shift on a day off without checking total hours.
  • Track hours worked, not just hours rostered, so you can see who is running hot.

How to build and run the roster

  1. Decide the cover you need. Minimum people per shift, day and night.
  2. Pick the pattern. Use 2-2-3 if protected weekends matter, 4-on-4-off if long recovery blocks matter, DuPont if you accept rotation for a week-long break.
  3. Assign crews and a start date. The cycle only works if every crew starts on the right day of the pattern.
  4. Mark public holidays and leave. Rotating patterns do not stop for holidays, so decide how a holiday on a working day is paid.
  5. Record actual attendance. Compare actual hours against the roster for payroll and overtime.

WibesHR lets you define shift timings and weekly off days, assign shifts to employees, record attendance with the hours worked, and feed that data into payroll, so rostered hours and paid hours stay in one system instead of a spreadsheet.

Frequently asked questions

How many hours a week is a 2-2-3 schedule?

On average 42 hours a week, because each person works 7 twelve-hour shifts in every 14-day cycle. Individual weeks vary between 24 and 60 hours depending on the week.

Is the 2-2-3 schedule the same as the Pitman schedule?

Yes. Pitman is the common name for the fixed 2-2-3 pattern with four crews and 12-hour shifts.

How many people do I need for a 24/7 12-hour schedule?

You need four crews. Each shift needs a full crew, with two crews on days and two on nights, and the pattern gives each crew about 42 hours a week on average.

Does a 12-hour shift mean automatic overtime?

Not automatically. Overtime depends on the law and your contract. In the US it depends on hours in the fixed workweek, and in other countries on daily and weekly limits or on the contract. Check the rule for your location before you set the pay rules.

Which is better, 2-2-3 or 4-on-4-off?

There is no single best pattern. 2-2-3 gives shorter work blocks and regular long weekends. 4-on-4-off gives longer breaks but longer runs of work. Choose based on your fatigue risk, staffing and what the team prefers.

Run your HR, payroll and vendor operations from one platform